Home › ENGINE · 2TR-FBE › EMISSION CONTROL › AIR SWITCHING VALVE

AIR SWITCHING VALVE > INSPECTION

for Preparation Click here



1. INSPECT AIR SWITCHING VALVE ASSEMBLY
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    4.5 to 5.5 Ω
    1 - Body ground
    Always
    1 MΩ or higher
    2 - Body ground

    HINT:
    When measuring the resistance make sure that the surface temperature of the air switching valve is 20°C.

    If the result is not as specified, replace the air switching valve assembly.



    A099565E02
  1. Check operation of the air switching valve.

    1. Check that air does not flow from port A to port B.
      If the result is not as specified, replace the air switching valve assembly.



    2. A110279E01
    3. Apply battery voltage across terminals 1 and 2.

    4. Check that air flows from port A to port B.
      If the result is not as specified, replace the air switching valve assembly.