Home › ENGINE ยท 1GR-FE › EMISSION CONTROL › VACUUM SWITCHING VALVE

VACUUM SWITCHING VALVE > INSTALLATION

for Preparation Click here



1. INSTALL PURGE VSV


A113417
  1. Install the purge VSV with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the 2 purge line hoses.

  1. Connect the purge VSV connector.



2. INSTALL V-BANK COVER
  1. Install the cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }