Home › ENGINE ยท 1GR-FE › EMISSION CONTROL › PCV VALVE

PCV VALVE > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER
  1. Remove the 2 nuts and cover.



2. REMOVE INTAKE AIR SURGE TANK


    A075597E01
  1. Disconnect the No. 5 water by-pass hose.



    A075598E01
  1. Disconnect the No. 4 water by-pass hose.



    A075644E01
  1. Disconnect the purge line hose.



    A075645E01
  1. Disconnect the No. 1 ventilation hose.



    A075646E01
  1. Disconnect the purge VSV connector.

  1. Disconnect the VSV (for ACIS) connector.

  1. Disconnect the throttle position sensor and control motor connector.

  1. Remove the 3 wire harness clamps and hose clamp.



    A075647E01
  1. Remove the 3 upper bolts, which are used to secure the 2 surge tank stays and throttle body bracket.



    A075648E01
  1. Using an 8 mm hexagon wrench, remove the 4 bolts.

  1. Remove the 2 nuts, intake air surge tank and gasket.



3. REMOVE VENTILATION VALVE SUB-ASSEMBLY


A112001
  1. Loosen the hose clamp and disconnect the ventilation hose from the valve.

  1. Remove the valve.