ENGINE OIL COOLER > INSTALLATION |
| 1. INSTALL OIL COOLER ASSEMBLY |
Install 2 new gaskets to the oil cooler.
Install the oil cooler to the oil cooler cover with the 4 nuts.
| 2. INSTALL OIL COOLER COVER SUB-ASSEMBLY |
Install a new gasket and the oil cooler cover with the 13 bolts and 2 nuts.
Connect the oil pressure connector and install the wire harness.
| 3. INSTALL STARTER ASSEMBLY |
| 4. INSTALL FUEL SUPPLY PUMP ASSEMBLY |
| 5. INSTALL COMMON RAIL ASSEMBLY |
| 6. INSTALL OIL FILTER SUB-ASSEMBLY |
Check and clean the oil filter installation surface.
Apply clean engine oil to the gasket of a new oil filter.
Lightly screw the oil filter into place by hand. Tighten it until the gasket contacts the seat.
![]() |
Using SST, tighten the oil filter. Depending on the space available, choose from the following.
If enough space is available, use a torque wrench to tighten the oil filter.
If enough space is not available to use a torque wrench, tighten the oil filter 3/4 of a turn by hand or with a common wrench.
| 7. ADD ENGINE OIL |
Add new engine oil.
| Item | Oil Grade | Oil Viscosity (SAE) |
| w/ Glow Plug Controller | API CF-4, CF or ACEA B1 | - 5W-30 - 10W-30 - 15W-40 - 20W-50 (5W-30 is best choice for fuel economy and good starting in cold winter.) |
| w/o Glow Plug Controller | G-DLD1, API CF-4, CF or ACEA B1 | - 5W-30 - 10W-30 - 15W-40 - 20W-50 |
| Item | Specified Condition |
| Drain and refill without oil filter change | 6.6 liters (7.0 US qts, 5.8 Imp. qts) |
| Drain and refill with oil filter change | 6.9 liters (7.3 US qts, 6.1 Imp. qts) |
| Dry fill | 7.4 liters (7.8 US qts, 6.5 Imp. qts) |
Install the oil filler cap.
| 8. BLEED AIR FROM FUEL SYSTEM |
| 9. ADD ENGINE COOLANT |
Tighten the radiator drain cock plug by hand.
Tighten the cylinder block drain cock plug.
![]() |
Fill the radiator with TOYOTA Super Long Life Coolant (SLLC) to the reservoir tank's B line.
| Item | Specified Condition |
| A/T | 11.1 liters (11.7 US qts, 9.8 Imp. qts) |
| M/T | 9.8 liters (10.4 US qts, 8.6 Imp. qts) |
Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
If the coolant level drops below the B line, add TOYOTA SLLC to the B line.
Install the radiator reservoir cap.
![]() |
Using a wrench, install the vent plug.
Bleed air from the cooling system.
Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.
Maintain the engine speed at 2,500 to 3,000 rpm.
Press the inlet and outlet radiator hoses several times by hand to bleed air.
Stop the engine and wait until the coolant cools down to ambient temperature.
![]() |
After the coolant cools down, check that the coolant level is at the F line.
If the coolant level is below the F line, add TOYOTA SLLC to the F line.
| 10. INSPECT FOR COOLANT LEAK |
Check for engine coolant leaks (Click here).
| 11. INSPECT FOR FUEL LEAK |
| 12. INSPECT FOR OIL LEAK |
Start the engine. Make sure that there are no oil leaks from the areas that were worked on.
| 13. INSTALL NO. 1 ENGINE UNDER COVER |