Home › ENGINE ยท 2KD-FTV › CHARGING › GENERATOR

GENERATOR > INSTALLATION

for Preparation Click here



1. INSTALL GENERATOR ASSEMBLY


A195391E01
  1. Install the generator with the 2 bolts.

    Torque:
    for bolt A:
    62 N*m{ 632 kgf*cm , 46 ft.*lbf }
    for bolt B:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

  1. Install the generator wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the generator connector.



2. INSTALL NO. 2 IDLER PULLEY ASSEMBLY
  1. Install the spacer, No. 2 idle pulley and pulley plate with the bolt.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }



3. INSTALL FAN AND GENERATOR V BELT
  1. Rotate the V-ribbed belt tensioner pulley clockwise, and then install the fan and generator V belt.

    NOTICE:
    Make sure that the fan and generator V belt is set properly on each pulley.

  1. Check that the indicator mark of the tensioner (Click here).



4. INSTALL AIR CLEANER ASSEMBLY
  1. Connect the air cleaner hose.

  1. Install the cleaner with the 2 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }

  1. Tighten the hose clamp.

  1. Connect the connector to the mass air flow meter connector.



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).