Home › ENGINE · 1KD-FTV › CHARGING › GENERATOR (for DENSO Made)

GENERATOR (for DENSO Made) > INSPECTION

for Preparation Click here



1. INSPECT GENERATOR ROTOR ASSEMBLY


    A118445E02
  1. Check the rotor for an open circuit.

    1. Measure the resistance between the slip rings.

      Standard resistance:
      1.85 to 2.25 Ω at 20°C (68°F)

      If the result is not as specified, replace the rotor assembly.



    A118446E02
  1. Check if the rotor is grounded.

    1. Measure the resistance between each slip ring and the rotor.

      Standard resistance:
      10 kΩ or higher

      If the result is not as specified, replace the rotor assembly.

  1. Check that the slip rings are not rough or scored.
    If rough or scored, replace the rotor assembly.



    A118447E01
  1. Using a vernier caliper, measure the diameter of each slip ring.

    Standard diameter:
    14.2 to 14.4 mm (0.559 to 0.567 in.)

    Minimum diameter:
    14.0 mm (0.551 in.)

    If the diameter is less than the minimum, replace the rotor assembly.



2. INSPECT GENERATOR BRUSH HOLDER ASSEMBLY


A079305E02
  1. Using a vernier caliper, measure the exposed brush length.

    Standard exposed length:
    10.5 mm (0.413 in.)

    Minimum exposed length:
    4.5 mm (0.177 in.)

    If the exposed length is less than the minimum, replace the brush holder assembly.



3. INSPECT GENERATOR DRIVE END FRAME BEARING


    A122145
  1. Check that the bearing is not rough or worn, and that it rotates smoothly.
    If necessary, replace the generator drive end frame bearing.



4. INSPECT GENERATOR ROTOR BEARING


    A118444
  1. Check that the bearing is not rough or worn, and that it rotates smoothly.
    If necessary, replace the generator rotor assembly.



5. INSPECT GENERATOR PULLEY WITH CLUTCH
  1. When rotating the pulley, check that it turns clockwise and that it does not turn counterclockwise.
    If the result is not as specified, replace the generator pulley with clutch.