Home › ENGINE ยท 2TR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (w/ Secondary Air Injection System)

AIR SWITCHING VALVE (w/ Secondary Air Injection System) > INSTALLATION

for Preparation Click here



1. INSTALL AIR SWITCHING VALVE ASSEMBLY


    A099545E01
  1. Install the valve with 2 new nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the connector.



2. INSTALL INTAKE PIPE INSULATOR


    A099544E01
  1. Install 2 new gaskets and the pipe with 4 new nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Check that the nuts are tightened to the torque specification.

    NOTICE:
    Tightening the nuts only once is not enough to tighten them to the torque specification.



3. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR


    A099543E01
  1. Install the heat insulator with the 5 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }



4. CONNECT NO. 4 AIR HOSE


    A110290
  1. Connect the No. 4 hose to the switching valve.

  1. Secure the hose with the clamp.



5. INSTALL AIR CLEANER ASSEMBLY