Home › ENGINE ยท 2TR-FBE › ENGINE CONTROL SYSTEM › SFI SYSTEM

SFI SYSTEM > PRECAUTION

for Preparation Click here



1.INITIALIZATION

NOTICE:
  1. Perform initialization (throttle position) after replacing the throttle body with motor assembly or cleaning any throttle body with motor assembly components .
  2. Perform initialization (throttle position) after reconnecting the battery cable or replacing the ECM .
  3. If the ECM is replaced, register the ECM communication ID for the immobiliser system (refer to the Service Bulletin for Registration).
  4. Perform Registration (VIN registration) when replacing the ECM (Click here).