Home › Vehicle Exterior › BODY WELD POINT › QUARTER PANEL
BM33K0E _01 Vehicle Exterior _046210 BODY WELD POINT _0223723 QUARTER PANEL F

BODY WELD POINT  QUARTER PANEL  CUT AND JOIN REPLACEMENT SECTIONS (SMALL AREAS)  


K125168

REMOVAL


Symbol Meaning
K108818

Remove Weld Points
K108827

Cut and Join Location
K108828

Cut Location for Supply Parts

a.

Be careful when cutting as foamed sealing material is located near the cutting position.

K125213C01
2.521,1.698 2.833,1.854 0.313,0.156 10 false *a
*a 215 mm (8.46 in.) - -
K108840

Foamed Sealing Material - -


K125214



INSTALLATION


Symbol Meaning
K108823

Plug Weld
K108831

Butt Weld
K108834

Body Sealer

a.

Inspect the fitting of the related parts around the new parts before welding. This affects the appearance of the finish.


b.

Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimensions)


c.

Before installing a new part, apply body sealer.

HINT:
·

Apply body sealer evenly about 5 mm (0.20 in.) from the flange, avoiding any oozing.

·

Apply body sealer evenly, about 3 to 4 mm (0.12 to 0.16 in.) in diameter.



K125215C01
6.188,1.99 6.5,2.146 0.313,0.156 10 false *a
*a 5 mm (0.20 in.) - -



d.

Be careful when welding as foamed sealing material is located near the area that is cut and joined together.

K125216C01
2.958,2.427 3.25,2.833 3.25,2.833 3.417,2.833 false 3.458,2.75 3.771,2.906 0.313,0.156 10 false *1
*1 QUARTER PANEL - -
K108840

Foamed Sealing Material - -



e.

After welding, apply body sealer to the corresponding parts. (See the painting/coating)


f.

After applying the top coat, apply anti-rust agent to the internal panel portion of the closed section structural weld points.