Home › Power Source / Network › 1GD-FTV BATTERY / CHARGING › GENERATOR(for 90A Type)
RM33K0E _57 Power Source / Network _043544 1GD-FTV BATTERY / CHARGING _0211318 GENERATOR(for 90A Type) A

1GD-FTV BATTERY / CHARGING  GENERATOR(for 90A Type)  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.

Install the 2 generator brackets with the 2 bolts.

Torque:
8.4 N*m (86 kgf*cm, 74 in.*lbf)


b.

Install the generator assembly with the 2 bolts.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


c.

Attach the 3 clamps and connect the wire harness.


d.

Connect the wire harness to terminal B with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


e.

Install the terminal cap.


f.

Connect the generator connector and attach the clamp.


g.

Connect the intake air temperature sensor connector.


Hide 16361A 2.INSTALL FAN AND GENERATOR V BELT

Hide 17344E 3.INSTALL NO. 4 AIR HOSE

Hide 74431 4.INSTALL BATTERY TRAY

Hide 28800 5.INSTALL BATTERY

Hide 74404B 6.INSTALL BATTERY CLAMP SUB-ASSEMBLY

a.

Install the battery clamp sub-assembly with the 2 nuts and 2 battery clamp bolts.

Torque:
5.4 N*m (55 kgf*cm, 48 in.*lbf)


Hide 7.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION