RM33K0E
_51
Engine / Hybrid System
_043575
1GR-FE EMISSION CONTROL
_0225058
PURGE VALVE
A
1GR-FE EMISSION CONTROL PURGE VALVE INSTALLATION
PROCEDURE
17650G
1.INSTALL PURGE VSV
a.
Install the purge VSV with the bolt.
- Torque:
- 9.0 N*m (92 kgf*cm, 80 in.*lbf)
b.
Connect the 2 purge line hoses to the purge VSV and slide the clamp to secure the hoses.
c.
Connect the purge VSV connector.