While the engine is being cranked, the starter signal is also sent to terminal STA of the ECM. The starter signal mainly performs engine control when the engine is started.
Refer to DTC P0617 for w/o Smart Entry and Start System.
Click hereEngine / Hybrid System>1GD-FTV ENGINE CONTROL>ECD SYSTEM>P0617
Inspect the fuses for circuits related to this system before performing the following procedure.
After replacing the ECM, the new ECM needs registration (Click here Engine / Hybrid System>1GD-FTV ENGINE CONTROL>ECD SYSTEM>REGISTRATION) and initialization (Click here Engine / Hybrid System>1GD-FTV ENGINE CONTROL>ECD SYSTEM>INITIALIZATION).
This procedure is based on the premise that the engine can crank normally. If the engine cannot crank normally, proceed to the problem symptoms table.
Click hereEngine / Hybrid System>1GD-FTV ENGINE CONTROL>ECD SYSTEM>PROBLEM SYMPTOMS TABLE
Connect the GTS to DLC3.
Turn the ignition switch to ON.
Turn the GTS on.
Enter the following menus: Powertrain / Engine and ECT / Data List / Primary / Starter Signal.
| Tester Display |
|---|
| Starter Signal |
Check the value displayed on the GTS when the ignition switch is turned to the ON and START positions.
| Ignition Switch Position | Starter Signal |
|---|---|
| ON | OFF |
| START | ON |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
| *1 | Engine Room Relay Block and Junction Block |
| *2 | ST NO. 1 Relay |
Remove the ST NO. 1 relay from the engine room relay block and junction block.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| ST NO. 1 relay terminal 2 - Body ground | Engine cranking | 11 to 14 V |
The engine does not crank because the relay is not installed.
| Proceed to |
|---|
| OK |
| NG (for manual transmission) |
| NG (for automatic transmission) |
OK
NG (for manual transmission)
NG (for automatic transmission)
Inspect the ST NO. 1 relay.
Click hereEngine / Hybrid System>1GD-FTV STARTING>RELAY>ON-VEHICLE INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the ST NO. 1 relay from the engine room relay block and Junction block.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| ST NO. 1 relay terminal 1 - Body ground | Always | Below 1 Ω |
| Result |
|---|
| OK |
| NG |
OK
NG
Remove the ST NO. 1 relay from the engine room relay block and junction block.
Disconnect the clutch start switch connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| B2-1 - ST NO. 1 relay terminal 2 | Always | Below 1 Ω |
| G49-22 (STA) - ST NO. 1 relay terminal 2 | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the clutch start switch.
| Result |
|---|
| OK |
| NG |
OK
NG
Disconnect the ignition switch assembly connector.
Disconnect the clutch start switch connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G133-2 (ST2) - B2-2 | Always | Below 1 Ω |
| G133-2 (ST2) - G49-11 (NSW) | Always | Below 1 Ω |
| G133-2 (ST2) or B2-2 or G49-11 (NSW) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the ignition switch assembly.
Click hereEngine / Hybrid System>1GD-FTV STARTING>IGNITION SWITCH>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the ST NO. 1 relay from the engine room relay block and junction block.
Disconnect the park/neutral position switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| C22-5 - ST NO. 1 relay terminal 2 | Always | Below 1 Ω |
| G49-22 (STA) - ST NO. 1 relay terminal 2 | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the park/neutral position switch assembly.
Click hereDrivetrain>AC60F AUTOMATIC TRANSMISSION / TRANSAXLE>PARK / NEUTRAL POSITION SWITCH>REMOVAL
| Result |
|---|
| OK |
| NG |
OK
NG
Click hereDrivetrain>AC60F AUTOMATIC TRANSMISSION / TRANSAXLE>PARK / NEUTRAL POSITION SWITCH>REMOVAL
Disconnect the ignition switch assembly connector.
Disconnect the park/neutral position switch assembly connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G133-2 (ST2) - C22-4 | Always | Below 1 Ω |
| G133-2 (ST2) - G49-11 (NSW) | Always | Below 1 Ω |
| G133-2 (ST2) or C22-4 or G49-11 (NSW) - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the ignition switch assembly.
Click hereEngine / Hybrid System>1GD-FTV STARTING>IGNITION SWITCH>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG