Home › Engine / Hybrid System › 2TR-FBE ENGINE CONTROL › SFI SYSTEM › from 2016.07
RM33K0E _51 Engine / Hybrid System _054512 2TR-FBE ENGINE CONTROL _0269966 SFI SYSTEM J

2TR-FBE ENGINE CONTROL  SFI SYSTEM  Starter Signal Circuit  


DESCRIPTION

While the engine is being cranked, current flows from terminal ST2 of the ignition switch assembly to the clutch start switch*1 or the park/neutral position switch*2 and to terminal STA of the ECM (STA signal).

*1: for Manual Transmission Models

*2: for Automatic Transmission Models


WIRING DIAGRAM

CAUTION / NOTICE / HINT

NOTICE:
·

After turning ignition switch off, waiting time may be required before disconnecting the cable from the negative (-) battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) battery terminal notices before proceeding with work.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION

·

Inspect the fuses for circuits related to this system before performing the following procedure.



PROCEDURE

1.READ VALUE USING GTS (STARTER SIGNAL)
a.

Connect the GTS to DLC3.


b.

Turn the ignition switch to ON.


c.

Turn the GTS on.


d.

Enter the following menus: Powertrain / Engine and ECT / Data List / Primary / Starter Signal.

Powertrain > Engine and ECT > Data List
Tester Display
Starter Signal
50003 234 118

e.

Check the value displayed on the GTS when the ignition switch is turned to the ON and START positions.

OK:
Ignition Switch Position Starter Signal
ON OFF
START ON



Result:
Proceed to
OK
NG



OK

2.INSPECT ST NO. 1 RELAY

NG

8.CHECK ST NO. 1 RELAY (POWER SOURCE)
2.INSPECT ST NO. 1 RELAY

Result:
Proceed to
OK
NG



OK

3.INSPECT STARTER ASSEMBLY

NG

REPLACE ST NO. 1 RELAY

3.INSPECT STARTER ASSEMBLY
a.

Inspect the starter assembly.

Click hereEngine / Hybrid System>2TR-FBE STARTING>STARTER>INSPECTION


Result:
Proceed to
OK
NG



OK

4.CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - STARTER ASSEMBLY)

NG

REPLACE STARTER ASSEMBLY

4.CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - STARTER ASSEMBLY)
a.

Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.


b.

Disconnect the starter assembly connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
ST NO. 1 relay terminal 3 - C26-1 (ST) Always Below 1 Ω
ST NO. 1 relay terminal 3 or C26-1 (ST) - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

5.CHECK HARNESS AND CONNECTOR (BATTERY - STARTER ASSEMBLY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

5.CHECK HARNESS AND CONNECTOR (BATTERY - STARTER ASSEMBLY)
a.

Disconnect the cable from the negative (-) battery terminal.


b.

Disconnect the cable from the positive (+) battery terminal.


c.

Disconnect the starter assembly connector.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
Positive (+) battery terminal - D3-1 (B) Always Below 1 Ω



Result:
Proceed to
OK
NG



OK

6.CHECK HARNESS AND CONNECTOR (BATTERY - ST NO. 1 RELAY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

6.CHECK HARNESS AND CONNECTOR (BATTERY - ST NO. 1 RELAY)
a.

Disconnect the cable from the negative (-) battery terminal.


b.

Disconnect the cable from the positive (+) battery terminal.


c.

Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
Positive (+) battery terminal - ST NO. 1 relay terminal 5 Always Below 1 Ω



Result:
Proceed to
OK
NG



OK

7.CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - BODY GROUND)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

7.CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - BODY GROUND)
a.

Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
ST NO. 1 relay terminal 1 - Body ground Always Below 1 Ω



Result:
Proceed to
OK
NG



OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (ST NO. 1 RELAY - PARK/NEUTRAL POSITION SWITCH)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

8.CHECK ST NO. 1 RELAY (POWER SOURCE)
a.
A349019C01
0.24,0.229 0.552,0.427 0.313,0.198 10 false *1 0.938,2.583 1.25,2.781 0.313,0.198 10 false *2
*1 Engine Room Relay Block and Junction Block Assembly
*2 ST NO. 1 Relay


Remove the ST NO. 1 relay from the engine room relay block assembly.


b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
ST NO. 1 relay terminal 2 - Body ground Engine cranking 11 to 14 V


HINT:

The engine does not crank because the relay is not installed.



Result:
Result Proceed to
OK A
NG (for Manual Transmission Models) B
NG (for Automatic Transmission Models) C



A

9.INSPECT RELAY (ST NO. 1 RELAY)

B

11.CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - CLUTCH START SWITCH ASSEMBLY)

C

15.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ST NO. 1 RELAY)
9.INSPECT RELAY (ST NO. 1 RELAY)

Result:
Proceed to
OK
NG



OK

10.CHECK HARNESS AND CONNECTOR (ST NO.1 RELAY - BODY GROUND)

NG

REPLACE RELAY (ST NO. 1 RELAY)

10.CHECK HARNESS AND CONNECTOR (ST NO.1 RELAY - BODY GROUND)
a.

Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
ST NO. 1 relay terminal 1 - Body ground Always Below 1 Ω



Result:
Result Proceed to
OK (for Manual Transmission Models) A
OK (for Automatic Transmission Models) B
NG C



A

REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - CLUTCH START SWITCH ASSEMBLY)

B

REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - PARK/NEUTRAL POSITION SWITCH)

C

REPAIR OR REPLACE HARNESS OR CONNECTOR (ST NO. 1 RELAY - BODY GROUND)

11.CHECK HARNESS AND CONNECTOR (ST NO. 1 RELAY - CLUTCH START SWITCH ASSEMBLY)
a.

Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.


b.

Disconnect the clutch start switch assembly connector.


c.

Disconnect the ECM connector.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
ST NO. 1 relay terminal 2 - B2-1 Always Below 1 Ω
ST NO. 1 relay terminal 2 - C15-17 (STA) Always Below 1 Ω
ST NO. 1 relay terminal 2, B2-1 or C15-17 (STA) - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

12.INSPECT CLUTCH START SWITCH ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

12.INSPECT CLUTCH START SWITCH ASSEMBLY
a.

Inspect the clutch start switch assembly.

Click hereDrivetrain>CLUTCH>CLUTCH PEDAL SWITCH>INSPECTION

Result:
Result
OK
NG




OK

13.CHECK HARNESS AND CONNECTOR (IGNITION SWITCH ASSEMBLY - CLUTCH START SWITCH ASSEMBLY)

NG

REPLACE CLUTCH START SWITCH ASSEMBLY

13.CHECK HARNESS AND CONNECTOR (IGNITION SWITCH ASSEMBLY - CLUTCH START SWITCH ASSEMBLY)
a.

Disconnect the ignition or starter switch assembly connector.


b.

Disconnect the clutch start switch assembly connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
G133-2 (ST2) - B2-2 Always Below 1 Ω
G133-2 (ST2) or B2-2 - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

14.INSPECT IGNITION SWITCH ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

14.INSPECT IGNITION SWITCH ASSEMBLY
a.

Inspect the ignition switch assembly.

Click hereEngine / Hybrid System>2TR-FBE STARTING>IGNITION SWITCH>INSPECTION


Result:
Proceed to
OK
NG



OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - IGNITION SWITCH ASSEMBLY)

NG

REPLACE IGNITION SWITCH ASSEMBLY

15.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ST NO. 1 RELAY)
a.

Remove the ST NO. 1 relay from the engine room relay block and junction block assembly.


b.

Disconnect the park/neutral position switch assembly connector.


c.

Disconnect the ECM connector.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
C22-5 (L) - ST NO. 1 relay terminal 2 Always Below 1 Ω
C15-17 (STA) - ST NO. 1 relay terminal 2 Always Below 1 Ω
C22-5 (L), C15-17 (STA) or ST NO. 1 relay terminal 2 - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

16.INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

16.INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
a.

Inspect the park/neutral position switch assembly.

Click hereDrivetrain>AC60E AUTOMATIC TRANSMISSION / TRANSAXLE>PARK / NEUTRAL POSITION SWITCH>INSPECTION


Result:
Result
OK
NG



OK

17.CHECK HARNESS AND CONNECTOR (IGNITION SWITCH ASSEMBLY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM)

NG

17.CHECK HARNESS AND CONNECTOR (IGNITION SWITCH ASSEMBLY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM)
a.

Disconnect the park/neutral position switch assembly connector.


b.

Disconnect the ignition switch assembly connector.


c.

Disconnect the ECM connector.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
G133-2 (ST2) - C22-4 (B) Always Below 1 Ω
G133-2 (ST2) - C15-15 (NSW) Always Below 1 Ω
G133-2 (ST2) , C22-4 (B) or C15-15 (NSW) - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

18.INSPECT IGNITION SWITCH ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

18.INSPECT IGNITION SWITCH ASSEMBLY
a.

Inspect the ignition switch assembly.

Click hereEngine / Hybrid System>2TR-FBE STARTING>IGNITION SWITCH>INSPECTION


Result:
Proceed to
OK
NG



OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - IGNITION SWITCH ASSEMBLY)

NG

REPLACE IGNITION SWITCH ASSEMBLY