Home › Engine / Hybrid System › 2TR-FBE EMISSION CONTROL › PURGE VALVE › from 2016.07
RM33K0E _51 Engine / Hybrid System _054515 2TR-FBE EMISSION CONTROL _0272886 PURGE VALVE A

2TR-FBE EMISSION CONTROL  PURGE VALVE  INSTALLATION  


PROCEDURE

Hide 17650G 1.INSTALL PURGE VSV

a.

Install the bracket with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Install the purge VSV together with the bracket with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


c.

Connect the 2 purge line hoses to the purge VSV, and slide the 2 clips to secure the hoses.


d.

Connect the purge VSV connector.