Home › Engine / Hybrid System › 1GR-FE ENGINE CONTROL › THROTTLE BODY
RM3250E _51 Engine / Hybrid System _037981 1GR-FE ENGINE CONTROL _0176367 THROTTLE BODY A

1GR-FE ENGINE CONTROL  THROTTLE BODY  REMOVAL  


CAUTION / NOTICE / HINT

The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the throttle body with motor assembly removal/installation are shown below.

Necessary Procedure After Parts Removed/Installed/Replaced
Replacement Part or Procedure Necessary Procedures Effects/Inoperative when not Performed Link
·

Replacement of throttle body with motor assembly

·

Cleaning the deposits from the throttle body with motor assembly


Inspection After Repair Poor idle, engine start, etc. (Click here)

PROCEDURE

Hide 17705 2.REMOVE AIR CLEANER CAP SUB-ASSEMBLY WITH NO. 1 AIR CLEANER HOSE

a.
A356018

Detach the 2 clamps and disconnect the intake mass air flow meter connector.


b.
A356019

Disconnect the vacuum hose from the No. 1 air cleaner hose.


c.

Slide the clamp and disconnect the No. 2 ventilation hose from the No. 1 air cleaner hose.


d.
A356020

Loosen the hose clamp and disconnect the No. 1 air cleaner hose from the throttle body with motor assembly.


e.

Detach the 4 clamps and remove the air cleaner cap sub-assembly with No. 1 air cleaner hose.


Hide 22030 3.REMOVE THROTTLE BODY WITH MOTOR ASSEMBLY

a.
A356021

Slide the 2 hose clamps and disconnect the No. 4 water by-pass hose and No. 5 water by-pass hose.


b.
A356022

Disconnect the throttle body with motor connector.


c.

Remove the 4 bolts and throttle body with motor assembly.


d.

Remove the gasket from the intake air surge tank.