Home › Engine / Hybrid System › 5L-E ENGINE CONTROL › ECD SYSTEM › from 2016.01
RM3250E _51 Engine / Hybrid System _049910 5L-E ENGINE CONTROL _0245156 ECD SYSTEM J

5L-E ENGINE CONTROL  ECD SYSTEM  Air Conditioning Cut Control Circuit  


DESCRIPTION

This circuit cuts air conditioning operation during vehicle acceleration in order to increase acceleration performance. During acceleration with the vehicle speed at 30 km/h (19 mph) or less and the accelerator pedal opening angle at 45° or more, the A/C magnetic switch is turned off for several seconds.

The air conditioning is also controlled using the engine coolant temperature output from the ECM to the A/C amplifier.

WIRING DIAGRAM

A227852E07
5.917,2.323 6.354,2.521 0.438,0.198 10 false ECM 0.448,2 1.365,2.208 0.917,0.208 10 false A/C Amplifier 0.448,1.833 1.365,2.021 0.917,0.188 10 false G34*1, G77*2 5.906,2.156 6.375,2.354 0.469,0.198 10 false G121 5.563,0.865 6,1.063 0.438,0.198 10 false ACT 5.313,0.698 5.521,0.885 0.208,0.188 10 false 9 1.021,0.813 1.458,1.01 0.438,0.198 10 false ACT 1.448,0.76 2.083,0.958 0.635,0.198 10 false 4*1, 18*2 1.833,1.813 4.844,2.01 3.01,0.198 10 false *1: w/ Air Conditioner w/o PTC Heater, w/ Cooler 1.844,2.125 4.104,2.542 2.26,0.417 10 false *2: w/ Air Conditioner w/ PTC Heater, w/o Air Conditioner w/ PTC Heater

PROCEDURE

1.READ VALUE USING GTS (CHECK OPERATION OF AIR CONDITIONING CUT CONTROL)
a.

Connect the GTS to the DLC3.


b.

Start the engine and turn the air conditioning switch on.

HINT:

The A/C magnetic clutch is turned on.



c.

Enter the following menus: Powertrain / Engine and ECT / Active Test / Comtrol the A/C Cut Signal

Powertrain > Engine > Active Test
Tester Display
Control the A/C Cut Signal
50004 234 48

d.

Check operation of the A/C magnetic clutch cut when air conditioning cut control is operated by the GTS.

OK:

A/C magnetic clutch is turned off.



Result:
Proceed to
OK
NG



OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE

NG

2.INSPECT ECM (ACT VOLTAGE)
2.INSPECT ECM (ACT VOLTAGE)
a.
A154534C89
2.521,0.229 2.927,0.479 0.406,0.25 2.938,0.885 2.74,1.635 true 2.563,0.281 2.906,0.448 0.344,0.167 10 false G121 0.135,0.052 0.365,0.219 0.229,0.167 10 false *a 2.51,1.656 3.135,1.844 0.625,0.188 10 false 9 (ACT)
*a Component with harness connected
(ECM)


Start the engine.


b.

Measure the voltage according to the value(s) in the table below.

Standard voltage:
Tester Connection Condition Specified Condition
G121-9 (ACT) - Body ground Engine idling 11 to 14 V
G121-9 (ACT) - Body ground Ignition switch ON,engine stopped 0 to 3 V



Result:
Proceed to
OK
NG



OK

NG

3.CHECK HARNESS AND CONNECTOR (ECM - AIR CONDITIONING AMPLIFIER)
3.CHECK HARNESS AND CONNECTOR (ECM - AIR CONDITIONING AMPLIFIER)
a.

Disconnect the A/C amplifier connector.


b.

Disconnect the ECM connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard resistance:
for w/ Air Conditioner w/o PTC Heater, w/ Cooler
Tester Connection Condition Specified Condition
G34-4 (ACT) - G121-9 (ACT) Always Below 1 Ω
G34-4 (ACT) or G121-9 (ACT) - Body ground and other terminals Always 10 kΩ or higher

for w/ Air Conditioner w/ PTC Heater, w/o Air Conditioner w/ PTC Heater
Tester Connection Condition Specified Condition
G77-18 (ACT) - G121-9 (ACT) Always Below 1 Ω
G77-18 (ACT) or G121-9 (ACT) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

REPLACE AIR CONDITIONING AMPLIFIER ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR