Home › Engine / Hybrid System › 1GD-FTV INTAKE / EXHAUST › EXHAUST MANIFOLD W/ TURBOCHARGER › 2015.08–2016.01
RM3270E _51 Engine / Hybrid System _041675 1GD-FTV INTAKE / EXHAUST _0205215 EXHAUST MANIFOLD W/ TURBOCHARGER A

1GD-FTV INTAKE / EXHAUST  EXHAUST MANIFOLD W/ TURBOCHARGER  INSTALLATION  


PROCEDURE

Hide 1.INSTALL STUD BOLT

NOTICE:

If a stud bolt is deformed or its threads are damaged, replace it.


a.
A344970

Using an E10 "TORX" socket wrench, install the 3 stud bolts at the positions shown in the illustration.

Torque:
14.7 N*m (150 kgf*cm, 11 ft.*lbf)


b.
A344969

Using an E8 "TORX" socket wrench, install the 4 stud bolts at the positions shown in the illustration.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


c.
A344968

Using an E5 "TORX" socket wrench, install the 4 stud bolts at the positions shown in the illustration.

Torque:
5.5 N*m (56 kgf*cm, 49 in.*lbf)


Hide 17275 2.INSTALL COMPRESSOR OUTLET ELBOW

a.

Install the hose clamp with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Install a new gasket.


c.

Install a new gasket and the compressor outlet elbow with the 2 nuts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 17274 3.INSTALL COMPRESSOR INLET ELBOW

a.

Using an E8 "TORX" socket wrench, install a new gasket and the compressor inlet elbow with the stud bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Install the compressor inlet elbow to the turbocharger sub-assembly with the 2 nuts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


c.

Install the compressor inlet elbow stay with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 16027 4.INSTALL NO. 1 TURBO WATER PIPE SUB-ASSEMBLY

a.

Install a new gasket.


b.

Temporarily install the turbo water pipe sub-assembly with the bolt and 2 nuts.


c.

Tighten the bolt and 2 nuts.

Torque:
13 N*m (133 kgf*cm, 10 ft.*lbf)


d.

Connect the No. 1 turbo water hose and No. 2 turbo water hose to the No. 1 turbo water pipe sub-assembly and slide the 2 hose clips to secure the hoses.


Hide 15407 5.TEMPORARILY INSTALL TURBO OIL INLET PIPE SUB-ASSEMBLY

a.
A345118C01
2.448,1.802 2.76,1.958 0.313,0.156 10 true *b 0.729,1.813 1.042,1.969 0.313,0.156 10 true *a
*a NG
*b OK


Install a new gasket as shown in the illustration.

NOTICE:

Do not install the gasket upside down.



b.

Temporarily install the turbo oil inlet pipe sub-assembly with the 2 nuts.


Hide 17141 6.TEMPORARILY INSTALL EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY

a.

Install 2 new gaskets to the exhaust manifold and turbocharger sub-assembly.


b.

Temporarily install the exhaust manifold to turbocharger sub-assembly with 3 new nuts.


c.
A371249C01
0,0 0,0 false
*1 Collar
V100136

Engine Side


Temporarily install the exhaust manifold with turbocharger sub-assembly, 8 collars and the 8 plate washers to the cylinder head sub-assembly with 8 new nuts.

NOTICE:

Make sure that the side of the collar with the smaller diameter faces the exhaust manifold.



d.

Install a new gasket on the union bolt side to turbo oil inlet pipe sub-assembly.


e.

Temporarily install the union bolt.


Hide 15474 7.INSTALL TURBO OIL OUTLET PIPE

a.

Install a new gasket to the turbo oil outlet pipe.

NOTICE:

The claws of the gasket must face the turbo oil outlet pipe.



b.

Install the turbo oil outlet pipe with the 2 bolts.

Torque:
12 N*m (122 kgf*cm, 9 ft.*lbf)


c.

Connect the turbo oil outlet hose to the turbo oil outlet pipe, turbo oil inlet pipe and slide the 2 hose clips to secure the hoses.


Hide 17293 8.TEMPORARILY INSTALL TURBOCHARGER STAY

a.

Temporarily install the turbocharger stay to the turbocharger sub-assembly, with 3 bolts and nut.


Hide 17141 9.TIGHTEN EXHAUST MANIFOLD WITH TURBOCHARGER SUB-ASSEMBLY

a.
A371250E01
1.344,0.01 1.5,0.208 0.156,0.198 10 true 1 1.875,0.052 2.031,0.25 0.156,0.198 10 true 2 2.25,0.052 2.406,0.25 0.156,0.198 10 true 7 0.885,0.021 1.042,0.219 0.156,0.198 10 true 6 0.615,1.354 0.771,1.552 0.156,0.198 10 true 5 1.729,1.302 1.885,1.5 0.156,0.198 10 true 4 2.177,1.313 2.333,1.51 0.156,0.198 10 true 3 2.458,1.323 2.615,1.521 0.156,0.198 10 true 8

Tighten the exhaust manifold with turbocharger sub-assembly, to the cylinder head sub-assembly with 8 nuts.

Torque:
40 N*m (408 kgf*cm, 30 ft.*lbf)

HINT:

Tighten the nuts in the order shown in the illustration.



b.

Tighten the turbocharger sub-assembly, to the exhaust manifold with the 3 nuts.

Torque:
73 N*m (744 kgf*cm, 54 ft.*lbf)


c.

Tighten the 2 nuts and then union bolt of the turbo oil inlet pipe sub-assembly.

Torque:
for nut : 13 N*m (133 kgf*cm, 10 ft.*lbf)
for union bolt : 36 N*m (367 kgf*cm, 27 ft.*lbf)

NOTICE:

If the connecting part of the union bolt gasket is cracked, remove the connecting part.



Hide 17293 10.TIGHTEN TURBOCHARGER STAY

a.
A344955E01
1.833,0.188 2.042,0.417 0.208,0.229 10 true 1 2.771,0.448 2.979,0.677 0.208,0.229 10 true 2 1.531,2.969 1.74,3.198 0.208,0.229 10 true 3 0.365,1.99 0.573,2.219 0.208,0.229 10 true 4

Tighten the 3 bolts and nut of the turbocharger stay in the order shown in the illustration.

Torque:
24 N*m (245 kgf*cm, 18 ft.*lbf)


Hide 11.INSTALL WIRE HARNESS CLAMP BRACKET (for Manual Transmission)

a.

Connect the wire harness clamp and install the bolt.

Torque:
18.6 N*m (190 kgf*cm, 14 ft.*lbf)


Hide 12.INSTALL OIL COOLER TUBE BRACKET AND WIRE HARNESS CLAMP BRACKET (for Automatic Transmission)

a.

Attach the 2 wire harness clamps and connect the wire harness.


b.

Connect the oil cooler tube bracket with the bolt.

Torque:
13.5 N*m (138 kgf*cm, 10 ft.*lbf)


Hide 25601 13.INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY

Hide 16284 14.CONNECT TURBO WATER HOSE

a.

Connect the No. 1 turbo water hose and No. 2 turbo water hose to the water outlet sub-assembly, engine water pump assembly and slide the 2 hose clips to secure the hoses.

NOTICE:

The turbocharger sub-assembly may be damaged if the No. 1 turbo water hose and No. 2 turbo water hose are connected to the wrong locations.



Hide 16268 15.INSTALL NO. 1 WATER BY-PASS PIPE

Hide 12261 16.INSTALL PCV HOSE

a.

Attach the clamp and install the PCV hose.


b.

Slide the 2 hose clips to secure the hoses.


Hide 16279 17.INSTALL NO. 3 WATER BY-PASS PIPE

a.

Connect the 2 water hoses to the oil cooler assembly and No. 2 water by-pass pipe, and slide the 2 hose clips to secure the hoses.


b.

Install the No. 3 water by-pass pipe with the bolt.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 17701 18.INSTALL AIR CLEANER CASE SUB-ASSEMBLY

a.

Install the air cleaner case sub-assembly with the 3 bolts.

Torque:
6.0 N*m (61 kgf*cm, 53 in.*lbf)


b.

Connect the 3 wire harness clamps.


Hide 17801 19.INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

a.

Install the air cleaner filter element sub-assembly to the air cleaner case.


Hide 17705 20.INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH AIR CLEANER HOSE

a.

Attach the 4 clips to install the air cleaner cap sub-assembly with air cleaner hose.


b.

Tighten the hose clamp.

Torque:
4.0 N*m (41 kgf*cm, 35 in.*lbf)


c.

Connect the mass air flow meter connector and attach the 2 wire harness clamps.


Hide 16711 21.INSTALL FAN SHROUD

Hide 16470 22.INSTALL RADIATOR RESERVOIR

Hide 44369A 23.INSTALL NO. 1 OIL RESERVOIR BRACKET

Hide 44360 24.CONNECT VANE PUMP OIL RESERVOIR ASSEMBLY

Hide 16571C 25.INSTALL NO. 1 RADIATOR HOSE

Hide 17362B 26.INSTALL NO. 2 AIR TUBE

Hide 17344E 27.INSTALL NO. 4 AIR HOSE

Hide 25051 29.INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY

Hide 32.INSPECT FOR COOLANT LEAK

Hide 51410 36.INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY