19100P
1.INSTALL SPARK PLUG
Perform "Inspection After Repairs" after replacing the spark plug.
Click hereEngine / Hybrid System>1GR-FE ENGINE CONTROL>SFI SYSTEM>INITIALIZATION
Install the 6 spark plugs.
19500
2.INSTALL IGNITION COIL ASSEMBLY
Perform "Inspection After Repairs" after replacing the ignition coil assembly.
Click hereEngine / Hybrid System>1GR-FE ENGINE CONTROL>SFI SYSTEM>INITIALIZATION
Install the 6 ignition coil assemblies with the 6 bolts.
Connect the 6 ignition coil connectors.
17126
3.INSTALL NO. 2 SURGE TANK STAY
Install the No. 2 surge tank stay with the 2 bolts.
11259
4.INSTALL V-BANK COVER