Home › Brake › BRAKE SYSTEM (OTHER) › VACUUM PUMP(for 1KD-FTV, 2KD-FTV) › from 2016.01
RM3270E _54 Brake _041692 BRAKE SYSTEM (OTHER) _0244529 VACUUM PUMP(for 1KD-FTV, 2KD-FTV) A

BRAKE SYSTEM (OTHER)  VACUUM PUMP(for 1KD-FTV, 2KD-FTV)  INSTALLATION  


PROCEDURE

Hide 1.INSTALL VACUUM PUMP BEARING

a.
C111354

Using a press, press in a new vacuum pump bearing to the vacuum pump shaft.


Hide 2.INSTALL VACUUM PUMP SHAFT

a.
C111355N05
1.5,0.698 0.865,0.698 true 0.49,0.604 1.188,1.104 0.698,0.5 10 false SST

Using SST and a press, press in the vacuum pump shaft to the vacuum pump housing.

SST
09608-04031  


b.

Using snap ring pliers, install a new snap ring.

NOTICE:

Make sure that the snap ring is firmly installed to the groove.



Hide 29351 3.INSTALL VACUUM PUMP GEAR

a.

Temporarily install the woodruff key and vacuum pump gear to the vacuum pump assembly with the gear lock nut.


b.

Mount the vacuum pump gear in a vise.

NOTICE:

Place aluminum plates on the vise to prevent damage to the vacuum pump gear.



c.

Tighten the gear lock nut.

Torque:
110.3 N*m (1125 kgf*cm, 81 ft.*lbf)


Hide 4.INSTALL VACUUM PUMP BLADE

a.
C111356C04
0.396,0.208 0.677,0.51 0.281,0.302 10 false *a
*a Round End


Apply engine oil to the vacuum pump rotor, and install the vacuum pump rotor to the vacuum pump housing.


b.

Install 5 new vacuum pump blades with the round ends facing outward.

HINT:
·

Apply engine oil to the blades.

·

Make sure that the blades are flush with the vacuum pump rotor surface.




Hide 5.INSTALL VACUUM PUMP END COVER

a.

Mount the vacuum pump assembly in a vise.

NOTICE:

Place aluminum plates on the vise to prevent damage to the vacuum pump assembly.



b.

Apply engine oil to 2 new O-rings.


c.

Install the 2 O-rings.


d.

Install the vacuum pump end cover and temporarily install the 3 bolts.


e.

Using a 5 mm pin punch and hammer, tap in the 2 straight pins.


f.

Tighten the 3 bolts.

Torque:
7.9 N*m (80 kgf*cm, 69 in.*lbf)


Hide 29369 6.INSTALL CHECK VALVE SUB-ASSEMBLY

a.

Install a new gasket and the check valve sub-assembly.

Torque:
73.5 N*m (749 kgf*cm, 54 ft.*lbf)


b.

Install 2 new gaskets and the union with the union bolt.

Torque:
13.7 N*m (140 kgf*cm, 10 ft.*lbf)

HINT:

Insert the union pin into the hole of the casing.



Hide 29300 7.INSTALL VACUUM PUMP ASSEMBLY

a.

Install 2 new O-rings.


b.

Install the vacuum pump assembly to the engine with the 2 nuts.

Torque:
20.6 N*m (210 kgf*cm, 15 ft.*lbf)


c.

Connect the 2 hoses to the vacuum pump assembly with the clip.


Hide 11322A 8.INSTALL NO. 1 TIMING BELT COVER (for 1KD-FTV)

Hide 11322A 9.INSTALL NO. 1 TIMING BELT COVER (for 2KD-FTV)

Hide 16400 10.INSTALL RADIATOR ASSEMBLY

Hide 51442 12.INSTALL NO. 2 ENGINE UNDER COVER

Hide 51410 13.INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY