Home › Drivetrain › DRIVE SHAFT / PROPELLER SHAFT › PROPELLER SHAFT ASSEMBLY(for TSAM Made) › from 2016.01
RM3270E _52 Drivetrain _041685 DRIVE SHAFT / PROPELLER SHAFT _0245184 PROPELLER SHAFT ASSEMBLY(for TSAM Made) G

DRIVE SHAFT / PROPELLER SHAFT  PROPELLER SHAFT ASSEMBLY(for TSAM Made)  INSPECTION  


PROCEDURE

Hide 1.INSPECT PROPELLER SHAFT AND INTERMEDIATE SHAFT

C061260

a.

Using a dial indicator, measure the propeller shaft and intermediate shaft runout.

Maximum Runout:
Item Specified Condition
Propeller shaft 0.8 mm (0.0314 in.)
Intermediate shaft 0.8 mm (0.0314 in.)


If the shaft runout is more than the maximum, replace the shaft.


Hide 2.INSPECT SPIDER BEARING

a.

Clamp the propeller shaft in a vise between aluminum plates.

NOTICE:

Do not overtighten the vise.



b.

Check the spider bearings for wear or damage.


c.
C172298

Check the axial play of each spider bearing by turning the yoke while holding the shaft tightly.

Maximum bearing axial play:

0.05 mm (0.00196 in.)


If the bearing axial play is more than the maximum, replace the spider bearing.


Hide 37230 3.INSPECT CENTER NO. 1 SUPPORT BEARING ASSEMBLY

C118618

a.

While turning the center bearing by hand, check that it turns smoothly without catching and that there are no cracks or damage.

If there are any defects, replace the bearing.

If there is any damage to the lip of the center bearing case, replace the bearing.