Home › Brake › BRAKE SYSTEM (OTHER) › VACUUM SWITCHING VALVE(for 2TR-FE) › from 2016.01
RM3270E _54 Brake _041692 BRAKE SYSTEM (OTHER) _0249441 VACUUM SWITCHING VALVE(for 2TR-FE) A

BRAKE SYSTEM (OTHER)  VACUUM SWITCHING VALVE(for 2TR-FE)  INSTALLATION  


PROCEDURE

Hide 25861 1.INSTALL VACUUM SWITCHING VALVE BRACKET (for LHD)

a.

Install the vacuum switching valve bracket with the 2 nuts.

Torque:
6.4 N*m (65 kgf*cm, 57 in.*lbf)


Hide 25860 2.INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for LHD)

a.

Install the No. 1 vacuum switching valve assembly with the nut.

Torque:
7.0 N*m (71 kgf*cm, 62 in.*lbf)


b.

Connect the No. 1 air hose and No. 2 air hose to the No. 1 vacuum switching valve and slide the 2 clips to secure them.


c.

Connect the connector.


Hide 25860 3.INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY (for RHD)

a.

Install the No. 1 vacuum switching valve assembly with the nut.

Torque:
7.0 N*m (71 kgf*cm, 62 in.*lbf)


Hide 44763 4.INSTALL BOOSTER VACUUM TUBE (for RHD)

a.

Install the booster vacuum tube with the 3 nuts.

Torque:
6.4 N*m (65 kgf*cm, 57 in.*lbf)


b.

Connect the No. 1 air hose and No. 2 air hose to the No. 1 vacuum switching valve and slide the 2 clips to secure them.


c.

Connect the check valve to brake booster hose and union to connector tube hose and slide the 2 clips to secure them.


d.

Connect the connector and attach the wire harness clamp.