Home › Suspension › FRONT SUSPENSION › FRONT UPPER SUSPENSION ARM
RM1880E _53 Suspension _013223 FRONT SUSPENSION _0068548 FRONT UPPER SUSPENSION ARM G

FRONT SUSPENSION  FRONT UPPER SUSPENSION ARM  INSPECTION  


PROCEDURE

Hide 1.INSPECT FRONT UPPER SUSPENSION ARM ASSEMBLY LH

F049920

a.

As shown in the illustration, move the ball joint stud back and forth 5 times before installing the nut.


b.

Using a torque wrench, turn the nut continuously at a rate of 2 to 4 seconds per turn and take the torque reading on the fifth turn.

Torque:

0.98 to 4.5 N*m (10 to 45 kgf*cm, 9 to 39 ft.*lbf) or less



c.

Check for any cracks and grease leaks on the ball joint dust cover.