1.INSTALL FRONT NO. 1 HOOD MOULDING PAD LH
When installing the front No. 1 hood moulding pad, heat the front hood moulding surface using a heat light.
| Item | Temperature |
|---|---|
| Front Hood Moulding | 20 to 30°C (68 to 86°F) |
Do not heat the front hood moulding excessively.
Clean the front hood moulding surface.
Using a heat light, heat the front hood moulding surface.
Remove the double-sided tape from the front hood moulding surface.
Wipe off any tape adhesive residue with cleaner.
Install a new front No. 1 hood moulding pad.
Remove the peeling paper from the face of a new front No. 1 hood moulding pad.
After removing the peeling paper, keep the exposed adhesive free from foreign matter.
Install the front No. 1 hood moulding pad.
2.INSTALL FRONT NO. 1 HOOD MOULDING PAD RH
Use the same procedure described for the LH side.
3.INSTALL FRONT HOOD MOULDING PAD
When installing the front hood moulding pad, heat the front hood moulding surface using a heat light.
| Item | Temperature |
|---|---|
| Front Hood Moulding | 20 to 30°C (68 to 86°F) |
Do not heat the front hood moulding excessively.
Clean the front hood moulding surface.
Using a heat light, heat the front hood moulding surface.
Remove the double-sided tape from the front hood moulding surface.
Wipe off any tape adhesive residue with cleaner.
for Upper Side:
Install a new front hood moulding pad.
Remove the peeling paper from the face of a new front hood moulding pad.
After removing the peeling paper, keep the exposed adhesive free from foreign matter.
Install the front hood moulding pad.
for Lower Side:
Install a new front hood moulding pad.
Remove the peeling paper from the face of a new front hood moulding pad.
After removing the peeling paper, keep the exposed adhesive free from foreign matter.
Install the front hood moulding pad.