Home › Vehicle Exterior › EXTERIOR PANELS / TRIM › ROOF DRIP SIDE FINISH MOULDING
RM1880E _59 Vehicle Exterior _013254 EXTERIOR PANELS / TRIM _0068761 ROOF DRIP SIDE FINISH MOULDING A

EXTERIOR PANELS / TRIM  ROOF DRIP SIDE FINISH MOULDING  INSTALLATION  


CAUTION / NOTICE / HINT

HINT:
·

Use the same procedure for the RH and LH sides.

·

The procedure listed below is for the LH side.



PROCEDURE

Hide 1.INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP

NOTICE:
·

It is only necessary to perform this procedure when replacing a No. 1 roof drip side finish moulding clip with a new one.

·

If installing new No. 1 roof drip side finish moulding clips, remove the adhesive remaining where the No. 1 roof drip side finish moulding clips will be installed on the vehicle body and clean the vehicle body with a non-residue solvent.



HINT:

When installing a No. 1 roof drip side finish moulding clip, heat the vehicle body and clip using a heat light.


Standard:
Item Temperature
Vehicle Body 40 to 60°C (104 to 140°F)
No. 1 Roof Drip Side Finish Moulding Clip 20 to 30°C (68 to 86°F)


NOTICE:

Do not heat the vehicle body or clip excessively.


a.
B187426
2.063,0.781 2.375,0.781 false 0.99,1.042 1.229,1.042 1.229,1.042 1.344,1.5 true 1.823,0.667 2.052,0.854 0.229,0.188 10 false *1 0.74,0.927 0.948,1.125 0.208,0.198 10 false *a
*1 Adhesive
*a 2 to 3 mm Bead of Adhesive


Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new No. 1 roof drip side finish moulding clips.

HINT:

Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1991 psi) or more (when the temperature is 23°C (73°F))



b.

Apply primer to the body where the No. 1 roof drip side finish moulding clip will be installed.

NOTICE:

Do not let the primer dry.



c.

While using the position shown in the illustration as a reference, place the No. 1 roof drip side finish moulding clip onto the roof panel. Then position and install the clip after lightly pressing it so that the adhesive adheres to the primer.

B280934
0.625,0.323 0.833,0.531 0.208,0.208 10 false A 2.229,0.24 2.438,0.427 0.208,0.188 10 false B 5.031,1.385 5.208,1.563 0.177,0.177 10 false C 6.313,1.375 6.479,1.563 0.167,0.188 10 false D

Standard:
Area Measurement (Reference Value) Area Measurement (Reference Value)
A 19.3 mm (0.760 in.) C 7.1 to 7.6 mm (0.280 to 0.299 in.)
B 6.6 to 7.1 mm (0.260 to 0.280 in.) D 33.5 mm (1.32 in.)


NOTICE:

Install the rear roof drip side finish moulding when 40 minutes or more have elapsed after pressing and installing the No. 1 roof drip side finish moulding clips.


HINT:
·

Initial hardening time: 40 minutes

·

Complete hardening time: 48 hours




Hide 2.INSTALL ROOF DRIP SIDE FINISH MOULDING LH

a.

Attach the 2 clips to install the roof drip side finish moulding.