2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

REASSEMBLY

Removal / installation · Vehicles built from Aug 2013


1. INSTALL STARTER CLUTCH ASSEMBLY
  1. Apply high temperature grease to the steel ball, return spring, clutch roller, retainer, pinion gear and idler gear.

  1. A222255
    Insert the steel ball into the starter clutch hole.

  1. Insert the return spring into the starter clutch hole.

  1. A222616E02
    Install the starter clutch, idler gear, pinion gear, retainer and clutch roller to the starter housing.
    Text in Illustration 
    *1
    Return Spring
    *2
    Starter Clutch
    *3
    Idler Gear
    *4
    Pinion Gear
    *5
    Retainer
    *6
    Clutch Roller
    *7
    Starter Housing

  1. A102596
    Install the starter housing to the magnet switch with the 2 bolts.

    Torque:
    9.3 N*m{ 95 kgf*cm , 82 in.*lbf }


2. INSTALL STARTER ARMATURE ASSEMBLY
  1. Apply high temperature grease to the starter armature bearing.

  1. P004699E01
    Using a press, press the starter armature into the starter yoke.


3. INSTALL STARTER BRUSH HOLDER ASSEMBLY

  1. ST00096E05
    Align the claw of the brush holder with the groove of the starter yoke.
    Text in Illustration 
    *1
    Groove
    *2
    Claw

  1. Place the brush holder on the starter yoke.

  1. Install the 4 starter yoke brushes to the starter brush holder.

    1. Using a screwdriver, pull back the spring.

    2. Install the brush to the brush holder.

      NOTICE:
      Make sure that the positive (+) lead wires are not grounded.


4. INSTALL STARTER YOKE ASSEMBLY
  1. Install a new O-ring to the groove of the starter yoke.

  1. P005017E02
    Align the claws of the starter brush holder with the grooves of the magnet starter switch and install the starter yoke and starter armature.
    Text in Illustration 
    *1
    Groove
    *2
    Claw
    *3
    Punch Mark

  1. Align the punch mark of the starter yoke with the line of the magnet starter switch.

  1. S004229E04
    Install 2 new O-rings to the bolts.
    Text in Illustration 
    *1
    O-Ring

  1. Install the starter yoke with the 2 bolts.

    Torque:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf }

  1. Connect the lead wire to terminal C with the nut.

    Torque:
    5.9 N*m{ 60 kgf*cm , 52 in.*lbf }

← INSPECTION (from Aug 2013)INSTALLATION (Aug 2013 – Jul 2014) →