INSTALLATION

Removal / installation · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014


1. INSTALL STARTER ASSEMBLY
  1. for Manual Transmission:
    Install the starter assembly with the bolt and nut.

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }

  1. for Automatic Transmission:
    Install the starter assembly with the bolt and 2 nuts.

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }

  1. Connect the starter wire with the nut.

    Torque:
    21 N*m{ 215 kgf*cm , 16 ft.*lbf }

  1. Connect the starter connector.

  1. Install the terminal cap.


2. CONNECT CLUTCH RELEASE CYLINDER ASSEMBLY (for Manual Transmission)
  1. Connect the release cylinder with the 2 bolts.

    Torque:
    12 N*m{ 120 kgf*cm , 9 ft.*lbf }

  1. Install a new clip to the flexible hose.


3. INSTALL REAR ENGINE UNDER COVER ASSEMBLY
  1. Install the rear engine under cover with the 4 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


4. INSTALL FRONT NO. 1 FENDER APRON TO FRAME SEAL LH
  1. Install the frame seal with the 5 clips.


5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).