2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSTALLATION

Removal / installation · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014


1. INSTALL NO. 2 ECM BRACKET
  1. Install the No. 2 ECM bracket with the 2 screws.

    Torque:
    3.0 N*m{ 31 kgf*cm , 27 in.*lbf }


2. INSTALL NO. 1 ECM BRACKET
  1. Install the No. 1 ECM bracket with the 2 screws.

    Torque:
    3.0 N*m{ 31 kgf*cm , 27 in.*lbf }


3. INSTALL ECM
  1. Install the ECM with the bolt and nut.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the 6 connectors.


4. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY
  1. Install the glove compartment door (Click here).


5. PERFORM REGISTRATION (w/o DPF)
  1. Perform registration (Click here).

    HINT:
    Only perform registration when the ECM is replaced, either by itself or in any of the following combinations.
    1. ECM and Fuel Supply Pump
    2. ECM and Diesel Throttle Body Assembly
    3. ECM and Injector Assembly
    4. ECM and Engine Assembly


6. PERFORM REGISTRATION (w/ DPF)
  1. Perform registration (Click here).

    HINT:
    Only perform registration when the ECM is replaced, either by itself or in any of the following combinations.
    1. ECM and Fuel Supply Pump
    2. ECM and Diesel Throttle Body Assembly
    3. ECM and Injector Assembly
    4. ECM and Engine Assembly


7. START ENGINE (w/o DPF)
  1. When replacing the ECM, start the engine to initialize the new ECM (Click here).


8. START ENGINE (w/ DPF)
  1. When replacing the ECM, start the engine to initialize the new ECM (Click here).

← REMOVAL (from Aug 2014)INSTALLATION (from Aug 2014) →