2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

REASSEMBLY

Removal / installation · Vehicles built from Aug 2013


1. INSTALL STRAIGHT SCREW PLUG
  1. Install a new gasket and the plug to the timing gear case.

    Torque:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }


2. INSTALL OIL PUMP RELIEF VALVE
  1. Install the relief valve and spring to the timing gear case.

  1. Install a new gasket and the plug to the timing gear case.

    Torque:
    49 N*m{ 500 kgf*cm , 36 ft.*lbf }


3. INSTALL DRIVEN ROTOR
← INSPECTION (from Aug 2013)INSTALLATION (Aug 2013 – Jul 2014) →