2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

REASSEMBLY

Removal / installation · Vehicles built from Aug 2013


1. INSTALL STRAIGHT SCREW PLUG
  1. Install a new gasket and the plug to the timing gear case.

    Torque:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }


2. INSTALL OIL PUMP RELIEF VALVE
  1. Install the oil pump relief sleeve, oil pump relief valve, oil pump relief valve spring and oil pump relief valve guide to the timing gear case.

  1. Install the cushion and oil pump plate with 2 new bolts.

    Torque:
    9.1 N*m{ 93 kgf*cm , 81 in.*lbf }


3. INSTALL DRIVEN ROTOR
← INSPECTION (from Aug 2013)INSTALLATION (Aug 2013 – Jul 2014) →