2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

REASSEMBLY

Removal / installation · Vehicles built from Aug 2013


1. INSTALL OIL PUMP DRIVE GEAR
  1. Place the timing belt case on wooden blocks.

    NOTICE:
    Do not damage the timing pointer.

  1. A057459E02
    Insert the drive and driven gears into the timing belt case with the marks facing the oil pump cover side.
    Text in Illustration 
    *1
    Mark


2. INSTALL OIL PUMP COVER
  1. Apply adhesive to 2 or 3 threads of the screws.

    Adhesive:
    Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent

  1. Install the oil pump cover with the 8 screws.

    Torque:
    10 N*m{ 105 kgf*cm , 8 ft.*lbf }


3. INSTALL OIL PUMP RELIEF VALVE
  1. Insert the relief valve and spring into the installation hole of the timing belt case.

  1. Using a 12 mm hexagon wrench, install a new gasket and the plug.

    Torque:
    37 N*m{ 375 kgf*cm , 27 ft.*lbf }

← INSPECTION (from Aug 2013)INSTALLATION (Aug 2013 – Jul 2014) →