2013-2015 Land Cruiser Prado · Service Manual Drivetrain

REASSEMBLY

Removal / installation · Vehicles built from Aug 2013


1. INSTALL OUTPUT SHAFT REAR BEARING

F051076E01
  1. Using SST and a press, install a new output shaft rear bearing to the output shaft.

    SST
    09316-60011   (09316-00011)

  1. Apply a light coat of MP grease to the bearing.


2. INSTALL OUTPUT SHAFT CENTER BEARING
  1. Apply gear grease to the output shaft center bearing and install it to the output shaft.


3. INSTALL NO. 3 SYNCHRONIZER RING
  1. Apply gear oil to the No. 3 synchronizer ring and install it to the output shaft.

← INSPECTION (from Aug 2013)COMPONENTS (from Aug 2013) →