INSTALLATION
Removal / installation · Vehicles built Aug 2013 – Jul 2014
Versions by build date: Aug 2013 – Jul 2014 from Aug 2014
| 1. INSTALL GENERATOR ASSEMBLY |
Install the generator bracket to the generator with the bolt.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Install the generator with the 2 bolts.
- Torque:
- 43 N*m{ 438 kgf*cm , 32 ft.*lbf }
Install the generator bracket with the bolt.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Connect the wire harness clamp.
Install the wire harness with the 2 bolts.
- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Connect the generator connector to the generator.
Connect the generator wire with the nut.
- Torque:
- 9.8 N*m{ 100 kgf*cm , 87 in.*lbf }
Close the terminal cap.
| 2. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR |
Install the heat insulator with the 3 bolts.
- Torque:
- 13 N*m{ 133 kgf*cm , 10 ft.*lbf }
| 3. INSTALL WIRING HARNESS CLAMP BRACKET |
Install the wiring harness clamp bracket with the bolt.
- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Attach the clamp.
| 4. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY |
for Integrated Type:
Install the No. 2 idler pulley with the bolt.- Torque:
- 54 N*m{ 551 kgf*cm , 40 ft.*lbf }
for Separate Type:
Install the No. 2 idler pulley cover plate, No. 2 idler pulley and idler pulley cover plate with the bolt.- Torque:
- 54 N*m{ 551 kgf*cm , 40 ft.*lbf }
| 5. INSTALL FAN AND GENERATOR V BELT |
Set the V belt onto every part.

Text in Illustration *1
Vane Pump
*2
Water Pump
*3
No. 2 Idler
*4
Generator
*5
Cooler Compressor or Idler Pulley
*6
No. 1 Idler
*7
Crankshaft
*8
V-ribbed Belt Tensioner
While turning the belt tensioner counterclockwise, remove the pin.
- NOTICE:
- Make sure that the V belt is properly installed to each pulley.
Check that the belt fits properly in the ribbed grooves.
- HINT:
- Make sure to check by hand that the belt has not slipped out of the grooves on the bottom of the pulley.
| 6. INSTALL V-BANK COVER |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.

Text in Illustration *1
Pin
*2
Hook
| 7. INSTALL BATTERY TRAY |
| 8. INSTALL BATTERY |
| 9. INSTALL BATTERY HOLD DOWN CLAMP |
Install the battery hold down clamp with the 2 nuts.
- Torque:
- 6.0 N*m{ 61 kgf*cm , 53 in.*lbf }
| 10. CONNECT CABLE TO POSITIVE BATTERY TERMINAL |
| 11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
