INSPECTION
Inspection · Vehicles built from Aug 2013
| INSPECT PURGE VSV |
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
1 - 2
20°C (68°F)
23 to 26 Ω
1 - Body ground
Always
10 MΩ or higher
2 - Body ground
Always
10 MΩ or higher
- HINT:
- When measuring the coil resistance make sure that the surface temperature of the purge VSV is 20°C.
Check the operation of the purge VSV.
Check that air does not flow from port E to port F.

Text in Illustration *1
Port E
*2
Port F
*a
Does not flow


Air pressure
Apply battery voltage to the connector and check the VSV operation.

- OK:
Measurement Condition
Specified Condition
Battery positive (+) → terminal 1
Battery negative (-) → terminal 2
Air flows from port E to port F
If the result is not as specified, replace the purge VSV.Text in Illustration *1
Port E
*2
Port F


Air pressure