2013-2015 Land Cruiser Prado · Service Manual Vehicle Interior

INSTALLATION

Removal / installation · Vehicles built from Aug 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014

HINT:
  1. Use the same procedure for RHD and LHD vehicles.
  2. The procedure listed below is for LHD vehicles.


1. INSTALL INDOOR NO. 1 ELECTRICAL KEY ANTENNA ASSEMBLY
  1. Attach the clamp to install the indoor No. 1 electrical key antenna assembly.


2. INSTALL CONSOLE PANEL SUB-ASSEMBLY (for Manual Transmission)
  1. Connect each connector.

  1. Attach the 8 clips and 2 claws to install the console panel.


3. INSTALL CONSOLE PANEL SUB-ASSEMBLY (for Automatic Transmission)
  1. Connect each connector.

  1. Attach the 8 clips and 2 claws to install the console panel.


4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transmission)

B363431
  1. Install the shift lever knob and twist it in the direction indicated by the arrow.


5. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Automatic Transmission)

B363299E01
  1. Install the shift lever knob and twist it in the direction indicated by the arrow.

  1. Install the shifting hole cover to the shift lever knob.

    Text in Illustration 
    *1
    Shifting Hole Cover


6. INSTALL FRONT CONSOLE UPPER PANEL GARNISH
  1. w/o Seat Heater System:

    1. Connect the connector.

    2. Attach the 5 clips to install the front console upper panel garnish.

  1. w/o CRAWL:

    1. Connect each connector.

    2. Attach the 5 clips to install the front console upper panel garnish.

  1. w/ CRAWL:

    1. Attach the 5 clips to install the front console upper panel garnish.


7. INSTALL INSTRUMENT PANEL FINISH PANEL END LH
  1. Attach the 4 clips to install the instrument panel finish panel end LH.


8. INSTALL INSTRUMENT PANEL FINISH PANEL END RH
  1. Attach the 4 clips to install the instrument panel finish panel end RH.


9. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION
  1. Attach the 5 clips to install the No. 2 instrument panel finish panel cushion.


10. INSTALL NO. 1 INSTRUMENT PANEL FINISH PANEL CUSHION

HINT:
Use the same procedure described for the No. 2 instrument panel finish panel cushion.

← INSTALLATION (Aug 2013 – Jul 2014)COMPONENTS (from Aug 2013) →