INSTALLATION
Removal / installation · Vehicles built from Aug 2013
| 1. INSTALL PCV VALVE SUB-ASSEMBLY |
Apply adhesive to 2 or 3 threads of the PCV valve.
- Adhesive:
- Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
Install the PCV valve.
- Torque:
- 27 N*m{ 275 kgf*cm , 20 ft.*lbf }
Connect the PCV hose to the valve.
Secure the hose with the clamp.
| 2. CONNECT HEATER HOSE |
Connect the heater hose clamp.
| 3. INSTALL V-BANK COVER |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.

Text in Illustration *1
Pin
*2
Hook
