INSTALLATION
Removal / installation · Vehicles built from Aug 2013
| 1. INSTALL EMISSION CONTROL VALVE SET |
Install the emission control valve set with the 3 nuts.
- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
Align the paint mark with the projection and connect the No. 1 air hose.

Text in Illustration *1
Rib
*2
Paint mark
*a
RH Side
*b
Upper
- HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
Connect the emission control valve set connector.
| 2. INSTALL AIR TUBE |
Install 2 new gaskets to the air tube.

Text in Illustration *1
New Gasket
*2
Air Tube
Install the air tube with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{ 102 kgf*cm , 7 in.*lbf }
| 3. CONNECT WATER HOSE JOINT |
Connect the water hose joint with the bolt.
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
| 4. INSTALL AIR CLEANER CASE SUB-ASSEMBLY |
Install the air cleaner case with the 3 bolts.
- Torque:
- 12 N*m{ 122 kgf*cm , 9 ft.*lbf }
Attach the wire harness clamp.
Install the air cleaner filter element.
| 5. INSTALL AIR CLEANER CAP AND HOSE |
Install the air cleaner cap and hose.

Text in Illustration *a
Top
*b
Front
*c
RH
*d
Align cutout portion of hose with protrusion of throttle
*e
Paint Mark
Install the air cleaner cap and hose with the bolt and fasten the 4 hook clamps.
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Tighten the clamp.
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Attach the 4 clamps and connect the ventilation hose, vacuum hose and mass air flow meter connector.
- HINT:
- The direction of the hose clamp is indicated in the illustration.
| 6. INSTALL V-BANK COVER |
Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.

Text in Illustration *1
Pin
*2
Hook
| 7. INSTALL UPPER RADIATOR SUPPORT SEAL |
Install the upper radiator support seal with the 13 clips.
