2013-2015 Land Cruiser Prado · Service Manual Vehicle Interior

Certification ECU Power Source Circuit

Circuit diagnosis · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014

DESCRIPTION

This circuit provides power to the certification ECU.

WIRING DIAGRAM

B217872E04

INSPECTION PROCEDURE

NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.


1. CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU - BATTERY AND BODY GROUND)

  1. B199585E12
    Disconnect the G38 ECU connector.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    G38-1 (+B) - Body ground
    Always
    11 to 14 V
    G38-16 (IG) - Body ground
    Engine switch off
    Below 1 V
    G38-16 (IG) - Body ground
    Engine switch on (IG)
    11 to 14 V
    G38-17 (CUTB) - Body ground
    Always
    11 to 14 V

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    G38-15 (E) - Body ground
    Always
    Below 1 Ω

Text in Illustration 
*a
Front view of wire harness connector
(to Certification ECU)


NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)


← ID Code Box Power Source Circuit (from Aug 2014)Certification ECU Power Source Circuit (from Aug 2014) →