INSTALLATION
Removal / installation · Vehicles built from Aug 2013
| 1. INSTALL NO. 2 EMISSION CONTROL VALVE SET |
Install the No. 2 emission control valve set with the 3 nuts.
- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
Align the paint mark with the projection and connect the No. 1 air hose.

Text in Illustration *1
Paint Mark
*2
Rib
*a
Upper
*b
LH Side
- HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
Connect the No. 2 emission control valve set connector.
| 2. INSTALL NO. 2 AIR TUBE |
Install 2 new gaskets to the No. 2 air tube.

Text in Illustration *1
New Gasket
*2
No. 2 Air Tube
Install the No. 2 air tube with the 2 bolts and 2 nuts.
- Torque:
- 10 N*m{ 102 kgf*cm , 7 ft.*lbf }
| 3. INSTALL PURGE VSV |
Install the purge VSV (Click here).
