2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

REMOVAL

Removal / installation · Vehicles built from Aug 2013


1. REMOVE PURGE VSV
  1. Remove the purge VSV (Click here).


2. REMOVE NO. 2 AIR TUBE

  1. A223563
    Remove the 2 bolts, 2 nuts and No. 2 air tube.

  1. Remove the 2 gaskets from the No. 2 air tube.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.


3. REMOVE NO. 2 EMISSION CONTROL VALVE SET

  1. A223562
    Disconnect the No. 2 emission control valve set connector.

  1. Disconnect the No. 3 air hose.

  1. A223564
    Remove the 3 nuts and No. 2 emission control valve set.

← COMPONENTS (from Aug 2013)INSPECTION (from Aug 2013) →