Home › Engine / Hybrid System › 1KD-FTV INTAKE / EXHAUST › INTAKE MANIFOLD (w/ DPF)
REMOVAL
Removal / installation · Vehicles built Aug 2013 – Jul 2014
Versions by build date: Aug 2013 – Jul 2014 from Aug 2014
NOTICE:
When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.
1.
DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
After turning the engine switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work (Click here ).
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here ).
2.
REMOVE COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY
(Click here )
3.
REMOVE ELECTRIC EGR CONTROL VALVE ASSEMBLY
(Click here )
4.
REMOVE MANIFOLD ABSOLUTE PRESSURE SENSOR
Disconnect the manifold absolute pressure sensor connector and vacuum hose.
Remove the bolt and manifold absolute pressure sensor.
5.
REMOVE EMISSION CONTROL VALVE BRACKET
Remove the bolt and emission control valve bracket.
6.
REMOVE THROTTLE BODY BRACKET
Remove the 3 bolts and throttle body bracket.
7.
REMOVE NO. 1 GAS FILTER
Disconnect the vacuum hose and remove the No. 1 gas filter from the gas filter bracket.
8.
REMOVE GAS FILTER BRACKET
Detach the clamp and disconnect the wire harness.
Remove the bolt and gas filter bracket.
9.
DISCONNECT WIRE HARNESS
Remove the bolt and disconnect the wire harness.
for LHD: Remove the bolt and disconnect the wire harness.
Detach the 5 clamps and disconnect the wire harness from the cowl top panel.
10.
REMOVE INTAKE AIR CONNECTOR
Remove the 3 bolts, intake air connector and gasket.
11.
REMOVE NO. 1 FUEL PIPE
Disconnect the No. 2 fuel pipe (Click here ).
Remove the 4 bolts, union bolt, gasket and No. 1 fuel pipe.
Text in Illustration
*1
No. 2 Fuel Pipe
-
-
Union Bolt
-
-
12.
REMOVE NO. 4 INJECTION PIPE SUB-ASSEMBLY
Remove the bolt, nut and 2 No. 2 injection pipe clamps.
Using a 17 mm union nut wrench, loosen the union nuts and remove the No. 4 injection pipe.
Text in Illustration
*a
Common Rail Side
*b
Injector Side
13.
REMOVE NO. 2 FUEL PIPE
Using a 6 mm hexagon wrench, remove the union bolt and gasket.
Text in Illustration
Union Bolt
Fuel Check Valve
Remove the fuel check valve, gasket and No. 2 fuel pipe.
14.
REMOVE NO. 3 NOZZLE LEAKAGE PIPE
Disconnect the 2 fuel hoses.
Text in Illustration
Fuel Check Valve
Remove the 2 bolts.
Remove the fuel check valve, gasket and No. 3 nozzle leakage pipe.
15.
REMOVE NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY
Remove the 3 bolts.
Text in Illustration
Union Bolt
Remove the union bolt, gasket and No. 2 nozzle leakage pipe.
16.
REMOVE INTAKE PIPE STAY
Remove the bolt and intake pipe stay.
17.
REMOVE VACUUM CONTROL VALVE SET
Disconnect the 2 vacuum switching valve connectors.
Disconnect the 3 vacuum hoses, and then remove the 2 bolts and vacuum control valve set.
18.
REMOVE NO. 2 MANIFOLD STAY
Remove the bolt and No. 2 manifold stay.
19.
REMOVE NO. 1 GLOW PLUG CONNECTOR
Disconnect the No. 1 glow plug connector from the wire harness.
Remove the 4 screw grommets.
Remove the 4 nuts and No. 1 glow plug connector.
20.
REMOVE NO. 1 INTAKE MANIFOLD INSULATOR
21.
REMOVE INTAKE MANIFOLD INSULATOR
Remove the intake manifold insulator.
22.
REMOVE INTAKE MANIFOLD
Detach the sensor wire connector clamp from the intake manifold.
Remove the 2 nuts, 4 bolts, intake manifold and gasket.