2013-2015 Land Cruiser Prado · Service Manual Suspension

REASSEMBLY

Removal / installation · Vehicles built from Aug 2013


1. INSTALL FRONT SHOCK ABSORBER BUSH

  1. C214442E01
    Using SST and a press, install a new absorber bush.
    SST
    09710-30012   (09710-04071, 09710-04081)


2. INSTALL FRONT COIL SPRING LH

  1. C159782E02
    Secure SST in a vise.
    SST
    09727-30022   (09727-00010, 09727-00031)
    09727-00060  

  1. C275706E04
    Attach the arm of SST to the diameter of the coil spring.
    Text in Illustration 
    *a
    Correct
    *b
    Incorrect

    CAUTION:
    1. Make sure that the coil spring is installed so that the distance between the upper and lower hooks of SST is at the maximum.
    2. Make sure that the claws of the hooks are securely attached.

  1. Using SST, compress the coil spring.

    CAUTION:
    1. If the coil spring bends during the compression, immediately stop the compression and reinstall SST.
    2. Do not compress the spring until the coil springs contact each other.
    3. Do not use an impact wrench.

  1. C155966E02
    Install the coil spring to the shock absorber.

    HINT:
    Fit the lower end of the coil spring into the recess of the spring seat of the shock absorber.

    Text in Illustration 
    *a
    Lower End


3. INSTALL FRONT SUSPENSION SUPPORT SUB-ASSEMBLY LH
  1. Install the cushion, 2 retainers and suspension support to the piston rod.

  1. Temporarily install a new front shock absorber nut to the suspension support.

  1. C214441E01
    Position the suspension support as shown in the illustration.
    Text in Illustration 
    *A
    LH
    *B
    RH
    *1
    Absorber Bush
    *2
    Suspension Support Sub-assembly
    V100135
    Front

  1. Remove SST.

    HINT:
    Release the coil spring while checking the position of the suspension support.

    NOTICE:
    Do not use an impact wrench. It will damage the shock absorber rod.


4. TIGHTEN FRONT SUPPORT TO FRONT SHOCK ABSORBER NUT
  1. Tighten a new nut.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

← INSPECTION (from Aug 2013)INSTALLATION (from Aug 2013) →