2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSTALLATION

Removal / installation · Vehicles built from Aug 2013


1. INSTALL FRONT EXHAUST PIPE ASSEMBLY
  1. Install a new gasket and the front exhaust pipe to the exhaust manifold with 3 new nuts.

    Torque:
    54 N*m{ 554 kgf*cm , 40 ft.*lbf }

  1. Install the No. 1 exhaust pipe support bracket with the 2 bolts.

    Torque:
    71 N*m{ 724 kgf*cm , 52 ft.*lbf }

  1. Install the clamp with the bolt.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }


2. INSTALL CENTER EXHAUST PIPE ASSEMBLY

  1. A128853
    Using a vernier caliper, measure the free length of the compression spring.

    Minimum free length:
    38.5 mm (1.52 in.)

    1. If the free length is less than the minimum, replace the compression spring.

  1. A076194E11
    Using a plastic-faced hammer and wooden block, tap on a new gasket until its surface is flush with the front exhaust pipe.
    Text in Illustration 
    *1
    Gasket
    *2
    Wooden Block

    NOTICE:
    1. Be sure to install the gasket so that it is facing in the correct direction.
    2. Do not reuse the gasket.
    3. Do not damage the gasket.
    4. When connecting the exhaust pipe, do not push on the gasket with the exhaust pipe.

  1. Connect the center exhaust pipe to the 4 exhaust pipe supports.

  1. Install the center exhaust pipe with the 2 compression springs and 2 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }


3. INSTALL TAILPIPE ASSEMBLY
  1. Connect the tailpipe to the exhaust pipe support.

  1. Install a new gasket to the center exhaust pipe.

  1. Connect the tailpipe to the center exhaust pipe.

  1. Install the 2 bolts.

    Torque:
    48 N*m{ 489 kgf*cm , 35 ft.*lbf }


4. INSPECT FOR EXHAUST GAS LEAK
  1. If gas is leaking, tighten the areas necessary to stop the leak. Replace damaged parts as necessary.
← REMOVAL (from Aug 2013)ON-VEHICLE INSPECTION (from Aug 2013) →