2013-2015 Land Cruiser Prado · Service Manual Vehicle Exterior

REASSEMBLY

Removal / installation · Vehicles built from Aug 2013

HINT:
When installing the front hood moulding pad, heat the front hood moulding surface using a heat light.

Standard:
Item
Temperature
Hood Moulding
20 to 30°C (68 to 86°F)

NOTICE:
Do not heat the front hood moulding excessively.


1. INSTALL FRONT HOOD MOULDING PAD
  1. Clean the front hood moulding assembly surface.

    1. Using a heat light, heat the front hood moulding assembly surface.

    2. Remove the double-sided tape from the front hood moulding assembly surface.

    3. Wipe off any tape adhesive residue with cleaner.

  1. Install a new front hood moulding pad.

    1. Remove the peeling paper from the face of a new front hood moulding pad.

      HINT:
      After removing the peeling paper, keep the exposed adhesive free from foreign matter.

    2. Install the front hood moulding pad.

← DISASSEMBLY (from Aug 2013)INSTALLATION (from Aug 2013) →