Power Source Circuit
Circuit diagnosis · Vehicles built from Aug 2014
Versions by build date: Aug 2013 – Jul 2014 from Aug 2014
DESCRIPTION
This circuit provides power to operate the blind spot monitor sensor.WIRING DIAGRAM


INSPECTION PROCEDURE
- NOTICE:
- Inspect the fuses for circuits related to this system before performing the following inspection procedure.
| 1. CHECK HARNESS AND CONNECTOR (BLIND SPOT MONITOR SENSOR LH, BLIND SPOT MONITOR SENSOR RH - BATTERY AND BODY GROUND) |
Disconnect the blind spot monitor sensor LH connector.

Disconnect the blind spot monitor sensor RH connector.
Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
Tester Connection
Switch Condition
Specified Condition
R42-5 (BLB) - Body ground
Engine switch on (IG)
11 to 14 V
R42-5 (BLB) - Body ground
Engine switch off
Below 1 V
R43-5 (BRB) - Body ground
Engine switch on (IG)
11 to 14 V
R43-5 (BRB) - Body ground
Engine switch off
Below 1 V
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
R42-10 (BLGD) - Body ground
Always
Below 1 Ω
R43-10 (BRGD) - Body ground
Always
Below 1 Ω
| *a |
Front view of wire harness connector (to Blind Spot Monitor Sensor LH) |
| *b |
Front view of wire harness connector (to Blind Spot Monitor Sensor RH) |
|
|
||||
| OK | ||
| ||
