Home › Vehicle Exterior › BODY PANEL › ROCKER OUTER PANEL(for 3 Door)
BM27T0E _01 Vehicle Exterior _054380 BODY WELD POINT _0267622 ROCKER OUTER PANEL(for 3 Door) F

BODY WELD POINT  ROCKER OUTER PANEL(for 3 Door)  CUT AND JOIN REPLACEMENT SECTIONS  


K132814

Weld work for 980 MPa ultra high strength steel


1.

Follow the welding conditions below when welding ultra high strength steel to assure sufficient weld strength. (When repairing this model)

*a: When welding 2 panels together including 980 MPa ultra high strength steel.

Spot weld Pressure 2940 N (300 kgf, 661 lbf)
Weld current 10000 A
Weld time 18 Cyc. (0.30 Sec.)
Plug weld Plug diameter 10 mm (0.39 in.)
Wire type AWS A5.18 ER70S-3
Shield gas Metal active gas

*b: When welding more than 3 panels together including 980 MPa ultra high strength steel. (When plug welding a panel to the welded panels with the weld condition above.)

Plug weld Plug diameter Same as the standard method (See the introduction)
Wire type AWS A5.18 ER70S-3
Shield gas Metal active gas

HINT:

Be sure to use Metal active gas (Ar 80% + CO2 20%) as the shield gas when plug welding. Sufficient weld strength cannot be assured when using 100% CO2 shield gas.



REMOVAL


Symbol Meaning
K108818

Remove Weld Points
K108827

Cut and Join Location
K108828

Cut Location for Supply Parts

REMOVAL POINT
1.

Do not butt weld or heat repair because the heat decreases the strength of areas where ultra high strength steel is used. (See the introduction)


K132842C01
6.573,8.448 6.885,8.604 0.313,0.156 10 false *c 2.542,4.396 3.365,4.813 0.823,0.417 10 false 350 (13.78)
*c mm (in.) - -



INSTALLATION


Symbol Meaning
K108823

Plug Weld
K108831

Butt Weld

INSTALLATION POINT
1.

Inspect the fitting of the related parts around the new parts before welding. This affects the appearance of the finish.

2.

Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimensions)

3.

Follow the welding conditions when welding point *b to assure sufficient weld strength. (See the introduction)

4.

After welding, apply body sealer to the corresponding parts. (See the painting / coating)

5.

After applying the top coat, apply anti-rust agent to the internal panel portion of the closed section structural weld points.


K132843N01
3.396,4.802 3.708,5 0.313,0.198 10 false *b 3.604,5.896 3.917,6.094 0.313,0.198 10 false *b