Home › Engine / Hybrid System › 2TR-FE (EMISSION CONTROL) › CANISTER
RM27T0E _51 Engine / Hybrid System _053671 2TR-FE EMISSION CONTROL _0260595 CANISTER A

2TR-FE EMISSION CONTROL  CANISTER  INSTALLATION  


PROCEDURE

Hide 77740 1.INSTALL CANISTER

a.

Install the canister to the bracket.


b.

Connect the air inlet line hose.


c.

Connect the purge line hose.


d.

Connect the vent line hose.