Home › Engine / Hybrid System › 2TR-FE (EMISSION CONTROL) › PURGE VALVE
RM27T0E _51 Engine / Hybrid System _053671 2TR-FE EMISSION CONTROL _0260596 PURGE VALVE A

2TR-FE EMISSION CONTROL  PURGE VALVE  INSTALLATION  


PROCEDURE

Hide 25860 1.INSTALL PURGE VSV

a.

Install the purge VSV with the bolt.

Torque:
9.0 N*m (92 kgf*cm, 80 in.*lbf)


b.

Connect the 2 purge line hoses to the purge VSV.


c.

Connect the purge VSV connector.