Home › Engine / Hybrid System › 2TR-FE (EMISSION CONTROL) › PURGE VALVE
RM27T0E _51 Engine / Hybrid System _053671 2TR-FE EMISSION CONTROL _0260596 PURGE VALVE G

2TR-FE EMISSION CONTROL  PURGE VALVE  INSPECTION  


PROCEDURE

Hide 25860 1.INSPECT PURGE VSV

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1 - 2 20°C (68°F) 23 to 26 Ω
1 - Body ground Always 10 MΩ or higher
2 - Body ground


HINT:

When measuring the coil resistance make sure that the surface temperature of the purge VSV is 20°C.


If the result is not as specified, replace the purge VSV.


b.

Check the operation.

i.
A160987E02
1.614,1.646 1.798,1.795 0.184,0.149 10 *1 1.657,0.228 1.841,0.377 0.184,0.149 10 *2

Check that air does not flow from port E to port F.

Text in Illustration
*1 Port E
*2 Port F
V100135

Air


ii.

Apply battery voltage across the terminals.


iii.
A160988E02
0.937,1.641 1.104,1.787 0.168,0.146 10 *1 0.911,0.569 1.079,0.716 0.168,0.146 10 *2

Check that air flows from port E to port F.

Text in Illustration
*1 Port E
*2 Port F
V100135

Air

If the result is not as specified, replace the purge VSV.