Home › Engine / Hybrid System › 2TR-FE (EMISSION CONTROL) › AIR SWITCHING VALVE
RM27T0E _51 Engine / Hybrid System _053671 2TR-FE EMISSION CONTROL _0260599 AIR SWITCHING VALVE G

2TR-FE EMISSION CONTROL  AIR SWITCHING VALVE  INSPECTION  


PROCEDURE

Hide 25710 1.INSPECT AIR SWITCHING VALVE ASSEMBLY

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1 - 2 20°C (68°F) 4.5 to 5.5 Ω
1 - Body ground Always 1 MΩ or higher
2 - Body ground


HINT:

When measuring the resistance make sure that the surface temperature of the air switching valve is 20°C.


If the result is not as specified, replace the air switching valve assembly.


b.

Check the operation of the air switching valve.

i.
A354965E02
2.625,0.552 2.51,0.552 2.51,0.552 2.25,1.115 true 0.854,1.958 1.01,1.958 1.01,1.958 1.292,1.531 true 0.635,1.854 0.833,2.031 0.198,0.177 10 false *b 2.646,0.469 2.844,0.646 0.198,0.177 10 false *a

Check that air does not flow from port A to port B.

Text in Illustration
*a Port A
*b Port B
V100135

Air

NOTICE:

Make sure the applied pressure is 30 kPa (0.3 kgf/cm2, 4.4 psi) or less.


If the result is not as specified, replace the air switching valve assembly.


ii.
A354966E02
1.344,1.125 1.448,1.125 1.448,1.125 1.844,1.521 true 3.115,0.542 2.979,0.542 2.979,0.542 2.729,1.219 true 3.146,0.427 3.333,0.594 0.188,0.167 10 false *b 1.156,1.01 1.344,1.177 0.188,0.167 10 false *c 0.021,0.021 0.208,0.188 0.188,0.167 10 false *a

Apply battery voltage across terminals 1 and 2.

Text in Illustration
*a Component without harness connected
(Air Switching Valve Assembly)
*a Port A
*c Port B
V100135

Air

NOTICE:

Apply voltage for 2 minutes or less.



iii.

Check that air flows from port A to port B.

If the result is not as specified, replace the air switching valve assembly.