Home › Engine / Hybrid System › 1GR-FE (INTAKE / EXHAUST) › INTAKE MANIFOLD › 2015.06–2020.08
RM27T0E _51 Engine / Hybrid System _053678 1GR-FE INTAKE / EXHAUST _0260642 INTAKE MANIFOLD A

1GR-FE INTAKE / EXHAUST  INTAKE MANIFOLD  INSTALLATION  


PROCEDURE

Hide 17111 1.INSTALL INTAKE MANIFOLD

a.
A221467

Set a new gasket on each cylinder head.

NOTICE:
·

Align the port holes of the gasket and cylinder head.

·

Be careful of the installation direction.




b.

Set the intake manifold on the cylinder heads.


c.
A221466E03
0.344,1.74 0.635,1.948 0.292,0.208 10 true *1 0.073,0.302 0.313,0.51 0.24,0.208 10 true *1 3.125,0.281 3.385,0.51 0.26,0.229 10 true *1 3.073,1.74 3.375,1.958 0.302,0.219 10 true *1

Install and uniformly tighten the 6 bolts and 4 nuts in several passes.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)

Text in Illustration
*1 Nut

HINT:

Tighten the inner installation bolts of the intake manifold before tightening the outer bolts.



Hide 23807 2.INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

Hide 17129 3.INSTALL INTAKE AIR SURGE TANK

a.

Install a new gasket to the intake air surge tank.


b.
A221465E05
0.115,1.76 0.365,1.969 0.25,0.208 10 true *1 2.469,1.573 2.74,1.781 0.271,0.208 10 true *1

Install the intake air surge tank with the 4 bolts and 2 nuts in the order shown in the illustration.

Torque:
28 N*m (286 kgf*cm, 21 ft.*lbf)

Text in Illustration
*1 Nut


c.

Install the No. 1 surge tank stay with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


d.

Attach the wire harness clamp.


e.

Install the No. 2 surge tank stay with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


f.

Install the throttle body bracket with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


g.
A225183E01
2.241,2.234 2.651,2.399 0.409,0.165 10 120° 1.949,0.682 2.277,0.838 0.328,0.156 10 45° 1.273,2.327 1.273,2.657 false 1.275,2.672 1.314,2.326 false 2.471,0.137 2.644,0.281 0.172,0.144 10 *a 1.181,2.718 1.359,2.883 0.178,0.164 10 *b 1.893,2.74 2.071,2.904 0.178,0.164 10 *a 2.765,2.079 2.943,2.244 0.178,0.164 10 *c

Connect the No. 1 ventilation hose.


h.

Connect the No. 1 vacuum switching valve connector.


i.

Connect the No.1 fuel feed hose.

Text in Illustration
*a Front
*b Matchmark
*c Top

HINT:

Connect the hose so that the direction of the hose clamp is as indicated in the illustration.



j.
A225184E01
0.983,1.342 1.003,1.642 false 1.002,1.649 1.033,1.342 false 0.922,1.742 1.100,1.906 0.178,0.164 10 *b 2.021,1.61 2.199,1.775 0.178,0.164 10 *a 1.642,1.248 1.820,1.412 0.178,0.164 10 *c

Connect the throttle body connector.


k.

Connect the No. 4 water by-pass hose.


l.

Connect the No. 5 water by-pass hose.

HINT:

Connect the hose so that the direction of the hose clamp is as indicated in the illustration.



m.

Connect the 2 heater hose clamps.

Text in Illustration
*a Front
*b Matchmark
*c RH


Hide 17360 4.INSTALL AIR TUBE ASSEMBLY (w/ Secondary Air Injection System)

a.
A226131E01
2.567,0.171 2.741,0.334 0.174,0.163 10 *a 0.633,0.167 0.808,0.330 0.174,0.163 10 *1 2.012,0.643 2.186,0.806 0.174,0.163 10 *b 1.678,0.852 1.853,1.015 0.174,0.163 10 *2 1.957,0.946 2.272,1.103 0.315,0.157 10 60° 1.186,0.697 0.949,0.249 false 0.949,0.249 0.847,0.249 false 1.35,0.709 1.575,0.93 false 1.575,0.93 1.664,0.93 false

for Bank 1 Side:

Align the paint mark with the projection and connect the air tube assembly to the emission control valve set.

Text in Illustration
*1 Rib
*2 Paint Mark
*a RH Side
*b Upper

HINT:

Make sure the direction of the hose clamp is as shown in the illustration.



b.
A226132E01
0.333,1.128 0.482,1.278 0.150,0.150 10 *1 1.375,0.225 1.525,0.374 0.150,0.150 10 *2 2.481,0.263 2.631,0.412 0.150,0.150 10 *a 3.142,0.673 3.292,0.823 0.150,0.150 10 *b 0.714,0.894 0.62,1.213 false 0.62,1.213 0.531,1.213 false 0.956,0.837 1.219,0.301 false 1.219,0.301 1.342,0.301 false 3.076,1.141 3.400,1.297 0.324,0.156 10 60°

for Bank 2 Side:

Align the paint mark with the projection and connect the air tube assembly to the No. 2 emission control valve set.

Text in Illustration
*1 Paint Mark
*2 Rib
*a Upper
*b LH Side

HINT:

Make sure the direction of the hose clamp is as shown in the illustration.



c.

Install the 3 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 17881 5.INSTALL NO. 1 AIR CLEANER HOSE

a.
A225179E01
1.649,3.75 2.007,3.892 0.358,0.142 10 90° 2.547,0.874 2.896,1.016 0.349,0.142 10 90° 2.15,0.462 2.509,0.604 0.359,0.142 10 60° 0.776,3.903 0.667,4.051 false 0.667,4.051 0.487,4.051 false 0.881,3.841 0.619,3.571 false 0.619,3.572 0.512,3.572 false 0.293,3.976 0.444,4.127 0.151,0.150 10 *a 0.297,3.476 0.448,3.627 0.151,0.150 10 *b 1.902,0.442 2.054,0.592 0.151,0.150 10 *c 1.594,0.854 1.745,1.004 0.151,0.150 10 *d 2.374,3.239 2.525,3.389 0.151,0.150 10 *c 2.839,3.755 2.990,3.905 0.151,0.150 10 *e 1.361,0.545 1.521,0.691 0.159,0.145 10 *1 2.097,0.815 1.747,0.625 false 1.747,0.625 1.553,0.625 false

Install the air cleaner hose with the 2 clamps.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)

Text in Illustration
*1 Paint mark
*a Protrusion
*b Groove
*c Top
*d RH
*e Front


b.

Install the bolt.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


c.

Connect the vacuum hose and ventilation hose.

HINT:

The direction of the hose clamp is indicated in the illustration.



d.

Attach the wire harness clamp.


Hide 6.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).


Hide 11259 10.INSTALL V-BANK COVER

a.
A229926E01
3.134,0.612 3.284,0.759 0.150,0.147 10 *1 2.751,0.698 3.103,0.698 false 1.132,0.577 1.282,0.723 0.150,0.147 10 *2 0.932,0.814 0.996,0.652 false 0.996,0.652 1.109,0.652 false

Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.

Text in Illustration
*1 Pin
*2 Hook


Hide 51405A 11.INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY